Magnum XL-200 Operations Simulator v17.5

Live Track View
Station A Block — Lead-In A Block — Lift B Block — Course B Block — Safety Brakes C Block — Runout / Ready
00:00Sim Time
0Dispatches
--Course Time
--Last Interval
--Avg Interval
OFFRide Status
--Wind (mph)
--Temp (°F)
--Last Load
--Trim Brakes
--Trim psi
--Operating Hour
Ride Control Panels
1. Station Crew & Dispatch Chain
Operator Assistant
Apply control power to begin.
2. System & Block Controls
POWER
75s DELAY ⏩
A CLEAR
B CLEAR
C CLEAR
READY CLR
STATION CLR
ALARM
Brake Controls
C / Ready release explanation will appear here.
Simulator
Views: 1 Full · 2 Station Area · 3 Wide · R/B/K Follow · Space Pause · F Speed
3. Transfer Track Control Station
The Ready Brakes and the transfer track are one sliding platform. MOVE T.T. RIGHT puts the READY road on the course (normal running); MOVE T.T. LEFT puts the TRANSFER road on the course so a train can come down off the safeties. Past the platform the transfer track carries on as a fixed spur — position 2; winch a chained train back there to free the platform for a second one.
OK TO MOVE
TRANSFER TRK
Records
4. Checklists
    5. Operations Log
    Trim Simulation
    6. Trim Brakes & Maintenance
    Time every train from the lift crown to the Safety Brakes. 55 s or less — call Maintenance to increase trim pressure. Over 62 sopen the trim brakes and call Maintenance to decrease it. Management must be told about both. You may open or close the trims; only Maintenance changes the pounds.
    7. Train Timing Log
    Speed, wind and temperature are recorded every half hour. This log fills itself from the last timed train — your job is to act on what it shows.
    TimeTrnSecsWind°FLoadpsiAction
    Instructor — Day & Conditions
    8. Conditions
    Presets are curves over the operating day, not fixed settings — the ride drifts as the day goes on. Choose Custom to unlock the sliders and tune by hand.
    0.0
    72
    5
    75%